360 Gallery
The 360 Gallery uses a “Space-first” interface that allows you to visualise project coverage, compare progress across dates, and find exactly what you need without clicking through dozens of images.
1. The 360 Gallery Home Page
Your gallery is populated with Cards that feature your project’s floor plans. Choose between Drawings view or Walks view at the top.
The Drawings view shows the walks done by drawing, listed in alphabetical order. Shows the last walks per drawing by default.
The Walks view shows the latest walks done regardless of drawing.
Path Visualisation: Each card shows the actual path taken during a capture.
Multi-Date Visual Maps: Use the Timeline Bar or the Date Filters at the top of the gallery to select multiple dates.
Drag the slider to include more dates.
The Walk Cards will update to show paths from all selected dates in different colours.
Pro Tip: This is the fastest way to identify "blind spots." If a floor plan is empty, no walks have been performed in that area for the selected timeframe.


Additional filters at the top will help you search for walks with BIM or Minimodels enabled.
You can also upload walks from the Gallery page.
2. The Interactive Plan View (The "Pre-Walk" Screen)
From the Drawings View, clicking on any Walk Card opens the Interactive Plan View. This screen acts as a bridge between the map and the 360 environment.
The Timeline Bar: Located at the top of the plan. Select one or more dates to overlay historical paths on the map. Shows the number of walks available.
Right Panel: Select which dates you would like to view and easily search for a particular walk through the Search bar.
The Preview Window: Upon hovering over the path, you will see a preview of the 360 ° image at the specific point on the path.
Start & End Marker: The start and end of the walk are marked by 2 distinct icons (footsteps and an X).
How to enter the 360 Walk: Once you’ve found the right spot, click the point on the path to open a larger preview that shows the 360 images. Select “Open 360 viewer” to go to the full immersion mode.


3. Navigation Within the 360 Walk
Once you are inside the 360 environment, navigating through time is now more intuitive.
See Viewer Features
Summary of Quick Controls
Action | Result |
Select Multiple Dates | Overlays multiple colored paths on the floor plan. |
Hover on Path | Shows a thumbnail image of the walk. |
Open 360 Viewer | Launches the full-screen 360 environment. |
Drag Timeline Slider | Fast-travels through different capture dates. |